Ferry Point Park Upland Work

DBC performed the civil work as a subcontractor to Skanska USA for upgrades for new parking lots and utility trenching at Ferry Point Park in the Bronx. 10 Hutchinson River Parkway in the Bronx.

The scope of work included upgrading new parking lots which required demolition, paving, signage, striping/painting, medians, curbs, timber fencing and ramps. The utility trenching work included saw-cutting, excavating, trenching, concrete encasement duct bank, and backfilling of electrical trenches and drainage areas, including temporary patch and final paving. All site grading and civil work. DBC furnished and installed electrical equipment pads, light pole bases, bench and bike rack footings, storage shed footings and footings for the fence around the shed, and gate footings. We then installed new pathway striping and symbols within the park.

Project Details

  • Location : 10 Hutchinson River Parkway, Bronx, NY
  • Budgets : $ 5,000,000.00
  • Complete Date : May 2022
  • Client Name : NYC Economic Development Corporation