Site Improvements at liberty Island – Sandy restoration; Fencing, retaining walls, site restoration

DBC is the Prime General Contractor for this $6.2 Million project for Site Improvements at Liberty Island.

Work includes the fabrication and installation of new Stainless Steel Fencing at Fort Wood. This work includes installing concrete footings for all fence posts, utility, drainage and irrigation work, the relocation of existing pull boxes and conduits as well as the installation of new pull boxes and hand holes for site lighting and landscape restoration.

Scope of work along the Approach Mall, the Flag Plaza and the Main Mall includes installation of new Pedestrian Paving and resetting of existing paving throughout and the removal of trees, excavation, drainage, new soils and new tree installations in the East and West Bosque Areas. This work also involved the removal and replacement of the Granite Seat Walls on both the East and West Bosque Areas. Other work includes relocation of Kiosks, site utilities, trench drains and repointing granite.